SPECIFICATIONS (CONTINUED)
5. All non-standard backboxes by the Security Electronics Division.
6. All work performed in all Sections shall be performed in a series of stages floor by floor or area by
area in order not to disrupt daily business or institution activities.
Qualifications
1. Vendors shall have renovation and replacement experience, of occupied detention facilities.
2. Vendor shall provide copies of the company license number issued by the state, which signifies they
are approved to do security work in the state.
3. Vendor shall provide and include their UL508 Builder/Fabricator file number. Vendors that do not
have a UL508 file number listing SHALL NOT be approved to bid this particular project.
4. Provide a list of ten (10) projects that were completed by the submitting vendor. These projects must
have been designed to use industrial programmable controllers and touchscreens as described in this
specification and applied in a detention security application. The 10 projects should be similar in
size, scope, and price to this project. If subcontractors were used by the submitting Systems Vendor,
then that project shall not be used or included in the list, as this project is requiring a “Single Source
Responsibility” format requiring complete installation by full time employed employees of the
submitting Systems Vendor. Harris County will review each project submitted and disallow any
project not meeting the above requirements. If the total approved projects do not meet the minimum
10 required, Harris County will not approve the submitting systems vendor.
5. For each project listed provide:
a. The brand of PLC, Audio, Video and backbone equipment used
b. Values of the subsystems and total contract price
c. Technically describe the security components integration with each other
d. Provide Contact Person Name and Phone Number at each submitted project site that can confirm
that the systems vendor performed the installation in an acceptable manner.
e. List the names and roles of employees on the submitted projects.
6. The names and up to date phone numbers of Harris County, System Engineer and Harris County of
all Jail/Detention/Corrections projects installed by the submitting systems vendor, within the last 5
years.
7. Company’s history providing detention control systems.
8. Organizational chart with the resumes of individuals.
9. Provide a narrative description of all software to be utilized, network types, and interfaces with other
systems. Any custom software that is to be developed by the vendor needs to be described in detail.
10. Provide written confirmation, “Software Assurance Letter”, that at the completion of the Factory
Acceptance Test, the systems vendor will provide to Harris County, at no charge, custom installation
CDs or DVDs where Harris County can take a brand new computer and reload their touchscreen
software. Also all ladder-logic used on this project to date, WonderWare runtime files, and any
configuration files required to bring the system back up to working order. At the completion of the
project, before acceptance from Harris County and the final retainer payment, the systems vendor
will provide the software listed above, for the project. If this “Software Assurance Letter” is not
included, the submitting systems vendor will not be approved to bid this project.